108 MWh of Energy Generated since 2015!
So far, 108 MWh of Energy has been generated since the installation of 50kWph Solar Panels back in 2015 at our head office in Congleton.
Split between three roof spaces, the project included:
"The ability to produce clean energy from a sustainable source coupled with the financial ROI. The installation of the solar system forms a key factor in HMK’s application to obtain ISO14001" (Environmental Management System).
- Steve Hardy, Former Operations Manager
Watch a time-lapse of the project being carried out here:
© HMK Automation Group Ltd 2024